Power Systems Consultants staff have been engaged on a number of HVDC projects, where they have gained a broad range of knowledge and experience on the latest HVDC technology. PSC has been assisting ABB, the world leader in HVDC transmission, with a number of projects in several different countries. PSC staff have been working in Ludvika, Sweden where they have been completing project design and development, China where they have been commissioning a HVDC link for the Three Gorges hydropower project, and Finland where a HVDC Light link is being commissioned. Ludvika, SwedenTwo PSC engineers have been working in Ludvika, the HVDC factory for ABB in Sweden. Paul Cannin worked in the HVDC main circuit design and insulation co-ordination groups. The major projects he worked on included assisting in the preparation of the equipment specification for the Sharyland 150 MW back-to-back HVDC tie in Mission Texas and the DC Transient overvoltage studies for the SAPEI 1000MW HVDC project between Sardinia and the Italian mainland. Kent Horan, one of PSC’s Control Engineers, worked on the new control system for a major upgrade to the Apollo end of the Cabora Bassa HVDC link in South Africa. This project also includes the replacement of the Thyristor valves and associated equipment. The MACH 2 control system that Kent is working on is the world’s most widely used control system for HVDC transmission and this project will enhance his skills with the latest technology in this area.
|
THE POWER OF A GLOBAL PERSPECTIVE
![]() |
Click here for an overview & case studies of PSC Group’s work around the globe.

There are many reasons why clients are selecting PSC as their partner watch >




